Polyurea Coats Glass Surface without Prep or Primer

Job Description: This 20-year old building at Fort Wainwright Army Base was experiencing vapor and thermal insulation problems. The exterior siding and insulation was removed. 40 mils (1mm) POLYSHIELD SS-100® was applied on the back side of the sheetrock then 5" of 2 lb. density Polyurethane Foam was sprayed over the POLYSHIELD SS-100®. Excess foam was scarified and siding reinstalled. Over 500 gallons of POLYSHIELD SS-100® were used as well as 14,000 lbs. of foam.

Other Coatings Evaluated for Project: Synthetic Rubber Spray Applied. POLYSHIELD SS-100® was chosen because the synthetic rubber required 3 coats with 2 hours dry time in between.

Project:
Remedial Insulation and Vapor Barrier
(BLM) Fire Service Center

Owner:
US Government
Contact:
BLM Department of Interior

Installing Contractor:
Alaska Quality Insulators
Contact:
Jim Schuster
907.488.3832

System:
40 mils (1mm) POLYSHIELD SS-100® 5" (127mm) Polyurethane Foam

Total Area:
Approximately 2
0,000 sq. ft. (6,096 m2)

Completion Date:
Summer 1997