Primary
Containment Systems
Job
Description: Microscopic
cracks in the original epoxy coating of the fountain at the Fairbanks
Campus were leaking thousands of gallons of water a day. Part
of the leaking water was flooding the plumbing utilidor under
the fountain.
After
the application of POLYSHIELD SS-100®, the fountain is now
water tight.
Follow-up
Inspection: Summer 1996. Coating is performing well, with
no loss of water or discoloration.
Other
Coatings Evaluated for Project: Epoxy Coating