Secondary
Containment Systems
Job
Description: Coated
floor and walls of the air handlers to 64 mils. Floor was then
flooded (leak testing) with 1" of water and left for 6 hours.
No leaks in any of the 22 air handlers. The City of Detroit had
tried caulking, dikes, etc., to stop leaks with no success. Since
this job was completed, they have now given a contract to coat
standing seam air handler roofs and exterior duct work.
The
City of Detroit is very pleased with the job and has many more
projects to do with POLYSHIELD SS-100™ (elevator entrance
floors, walkways, steps, dish washing room floor, etc.).
Follow-up
Inspection: The City of Detroit contact, Herb Sanford,
and a Specialty Products, Inc. representative inspected this site
in July of 1999. No leaks, cracks or other deficiencies were found.
Other
Coatings Evaluated for Project: Epoxy
and urethane coatings were evaluated for this project.